New lease of life for the landmark structures of Whitehaven, including the Wave
Contents |
[edit] Introduction
An iconic waterfront structure was lit up to celebrate the coronation of King Charles III thanks to a collaboration between two West Cumbrian organisations.
The popular Wave landmark is one of the first things residents and tourists see when they arrive at Whitehaven Harbour by land or sea. The Wave, which used to be lit up for all to see from miles around, has remained in the dark for several years. Now, thanks to a collaboration between not-for-profit organisation Whitehaven Harbour Commissioners and solution specialists Forth, the Wave is set to shine once again.
The "soft" switch-on of the Wave took place on May 5 at 9.30pm and is the latest revamp of Whitehaven Harbour’s landmark structures, including renovating its famous lighthouses.
[edit] Project comments
Whitehaven Harbour Commissioners CEO John Baker said: “We’re thrilled to announce the relighting of the iconic Wave installation on Whitehaven Harbour. It’s been a long time coming, and we’re grateful for the hard work and collaboration of everyone involved in making this happen. We know this will bring immense joy to the people of Whitehaven who have been requesting its return for years."
"Forth has shown great commitment and endeavour to the project and alongside our own team, headed up by project manager Trevor Prowse, they've gone to enormous lengths to get The Wave relit in time for the King's coronation weekend. We must also say a special thank you to Gill Marsden, director of NIS Ltd and her team, including Hold Engineering, for donating their time, equipment and expertise to clean The Wave prior to the installation of the new lighting.Relighting the harbour is key to attracting tourism, new events and new investment to Whitehaven. Along with renovation of the lighthouses, and new developments such as The Bus Station and The Edge coastal activities centre, it all helps to create a thriving hub around the harbour and something that we can all be proud of.”
Mark Telford, Managing Director of Forth, which was recently named 11th in in-Cumbria business magazine’s Top 100 Businesses, said the project was about giving something back to the community.
Mark said: “We are delighted to have worked in collaboration with Whitehaven Harbour Commissioners on this project. It’s just the type of challenge we love at Forth and we are delighted we have come up with a sustainable, cost-effective solution which will hopefully bring a lot of joy to residents and visitors alike for years to come. By using the latest technology it will look far more dynamic and impressive than when it was last lit up, and will be far more resilient and environmentally friendly to power. As a Cumbrian company employing people across West Cumbria and Furness we are always delighted to be able to use our experience and expertise to help make our communities even better places to live, work and visit. Forth has been part of the fabric of the West Cumbria community for more than 20 years and working in partnership with Whitehaven Harbour Commissioners on a project as iconic as this is part of the legacy which comes from being able to build a successful business in the area.”
Whitehaven Harbour Commissioners CEO John Baker and Forth Managing Director Mark Telford. The two organisations have collaborated to light up The Wave at Whitehaven Harbour once again.
[edit] Design solutions
Forth, based in Maryport, Cleator Moor, and Barrow-in-Furness, came up with an environmentally-friendly, resilient and cost-effective solution to light up the Wave brighter and better than ever before. Forth’s solution features 400 metres of remotely-controlled high intensity LED lights, which cost significantly less to run than the previous lighting on the Wave when it last shone.
The business also used 3D printing technology to print 800 translucent brackets to allow maximum light through the silicon rubber casing while also being resilient to all weather conditions, including UV rays. Forth collaborated with fellow engineering business NIS Ltd, which also donated its time, in the final preparations to install the lighting.
[edit] Further information
Whitehaven Harbour Commissioners is a not-for-profit organisation, safely managing and maintaining Whitehaven Harbour and its environs for the benefit of all. For more information visit https://www.whitehavenhc.org.uk/
Forth is an award-winning UK advanced technology solutions business with bases at Maryport, Cleator Moor and Barrow-in-Furness in Cumbria.
Forth welcomes problem statements from any business or organisation and, using innovative technology, develops new methods which allows operators to achieve what was previously considered not possible. Forth helps clients to protect employees’ welfare and save time and money.
Among the services it provides is: manufacturing; decommissioning; mixed reality services; installation and site services; design and substantiation; innovation; deep recovery; and a trade counter.
In April 2023, Forth was named 11th in in-Cumbria business magazine’s Top 100 Businesses. To contact Forth visit www.forth.uk.com
This article and daytime images were issued in Press Release format as "Iconic landmark to shine again in time for coronation" on Friday May 5 and adjusted for issue on May 7 after the Coronation. Night-time images provided by Forth.
[edit] Related articles on Designing Buildings
- A review of Scotland's historic lighthouses.
- Adequate lighting.
- Architectural LED market.
- Astley Castle and the Landmark Trust.
- Bryden Wood appointed on the landmark St James scheme, Edinburgh.
- Cardiff tidal lagoon.
- Coastal defences.
- Conserving Cornish harbours.
- Illuminance.
- Lamp efficacy.
- Landmark Buildings stamps.
- Lighthouse.
- Lighting control.
- Lighting designer.
- Martello tower.
- Seashaken Houses: A lighthouse history from Eddystone to Fastnet.
- Thames barrier.
- Types of lamp.
- Types of lighting.
- Waterfronts Revisited: European ports in a historic and global perspective.
[edit] External links
https://forth.uk.com/2023/05/04/iconic-landmark-to-shine-again-in-time-for-coronation/
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.